Removing Load-Bearing Walls in Gilbert, AZ:

Open Your Home to Light, Space, and Style

Modern living in Gilbert often starts with a reimagined floor plan. For many homeowners, that means removing load-bearing walls to unlock bright, open-concept spaces that better suit their lifestyle. Whether you’re in Power Ranch, Val Vista Lakes, or Agritopia, structural wall removal is one of the most transformative remodeling upgrades you can make.

At Homework Remodels, we help Gilbert homeowners safely and expertly remove structural walls as part of our thoughtful, full-service remodeling process. From engineering to permitting and clean finishing, we bring your vision to life with care, precision, and structural integrity.

Why Gilbert Homeowners Remove Load-Bearing Walls

Many Gilbert homes built in the 1990s and early 2000s feature segmented floor plans, characterized by separate kitchens, compartmentalized dining rooms, and isolated family spaces. These layouts often feel outdated and disconnected. Removing a structural wall opens up the heart of your home and allows for:

Make Your Home Feel Larger Without Adding Square Footage

  • Greater visibility across rooms
  • More natural light and better airflow
  • Flexible furniture layouts
  • An ideal environment for entertaining, multitasking, and family living

For families in communities like Seville and the Islands, open floor plans create the perfect blend of elegance and everyday comfort.

Brighten Your Interior with Natural Light

Arizona sunshine is one of Gilbert’s best assets, but closed layouts block the flow of light. Removing a structural wall helps:

  • Maximize daylight throughout your main living areas
  • Highlight architectural features like vaulted ceilings or beams
  • Create a more uplifting and spacious environment

See our Gilbert Remodeling Overview →

How We Remove Load-Bearing Walls in Gilbert Homes

At Homework Remodels, we approach every wall removal with a proven system rooted in engineering, safety, and design integrity. Our process ensures that your home stays structurally sound while delivering the open look and feel you want.

Step 1: In-Home Evaluation and Planning

We begin with a visit to your home to understand your goals and assess the wall in question. We determine:

  • Whether the wall is truly load-bearing
  • What it supports (roof load, ceiling joists, second floor, etc.)
  • Existing mechanicals like HVAC, plumbing, or electrical systems inside the wall

We also explore how this change will interact with other design elements — cabinetry, flooring, ceiling textures, and trim details.

Step 2: Structural Engineering

We collaborate with licensed structural engineers to:

  • Analyze your home’s load path and framing configuration
  • Design the appropriate beam (LVL, steel, or glulam)
  • Determine support placement and specifications
  • Prepare stamped plans for the City of Gilbert permitting process

This step ensures the new open space will be safe, up to code, and built to last.

Step 3: Permitting with the City of Gilbert

As a licensed remodeling contractor, we handle all required permitting and inspections. We:

  • Submit engineered drawings
  • Coordinate with city plan reviewers
  • Schedule and pass inspections

Gilbert has specific requirements for structural changes, and we make sure your project meets every one of them.

Step 4: Safe Demolition and Temporary Support

Before removing the wall, we installed temporary shoring to hold the load. Our experienced crew then:

  • Carefully removes the framing and drywall
  • Preserves surrounding finishes as much as possible
  • Reroutes any utilities hidden within the wall

We work cleanly and efficiently, respecting your space and schedule.

Step 5: Beam Installation and Finishing Touches

Depending on your layout, we’ll install a flush beam (concealed) or drop beam (visible or boxed in). After structural installation, we finish the area with:

  • Matching drywall texture
  • Seamless ceiling and paint blending
  • Flooring transition or repairs
  • Integrated trim and finish carpentry

Our attention to detail ensures the new open space feels intentional and cohesive, not like an afterthought.

How Much Does It Cost to Remove a Load-Bearing Wall in Gilbert?

The cost varies based on the size of the wall, the type of beam, the ceiling configuration, and the complexity of rerouting utilities. In Gilbert, most projects range from $35,000 to $ 55,000 or more.

You’ll receive a detailed estimate during your consultation, which includes engineering, permitting, materials, labor, and finishing costs.

Cost factors include:

  • Beam span and material (steel vs. engineered wood)
  • Vaulted vs. flat ceilings
  • In-wall plumbing or wiring that needs rerouting
  • Scope of finish work (flooring, drywall, paint, etc.)

We provide a clear schedule and communicate throughout the process so you always know what to expect.

Combine Wall Removal with Other Remodeling Upgrades

Many Gilbert homeowners pair wall removal with other updates to achieve a complete transformation. Homework Remodels offers complete design-build remodeling services, including:

If you’re planning a gourmet kitchen, luxurious spa bath, or indoor-outdoor lifestyle upgrade, we’ll guide you from vision to completion.

Why Gilbert Families Choose Homework Remodels

We’re not just remodeling contractors — we’re trusted partners who care about your home, your family, and your goals. Our team is made up of nationally certified professionals, including:

  • NARI Master Certified Remodelers (MCR)
  • Master Certified Kitchen and Bath Remodelers (MCKBR)
  • Universal Design Certified Professionals (UDCP)

We’ve earned awards for excellence in design, structural renovation, and client care — and we bring that same level of dedication to every home we remodel in Gilbert.

⭐️ See what our clients are saying

Start with a Free Consultation

Whether you live in Val Vista Lakes, Agritopia, or The Islands, Homework Remodels can help you open up your space with expert wall removal and remodeling.

👉 Please fill out our contact form to get started.